
Add to Cart
PE 10 Packs Bottle Water Production Line Shrink Wrapping Machine
Quick detail
Project name | Automatic shrink wrapping machine |
Machine structure | Will be made basing on your final machine layout |
Application | Shrink wrap bottles in beverage production line |
Component | Bottle inlet conveyor with separate plate Film cutting head Electric heating tunnel Outlet roller conveyor Electric control cabinet |
Shrinking format | For normal drinking water bottle: 330ml-750ml: 4*6 / 4*5 1000ml-2000ml: 3*3 / 3*2 2.5L: 3*2
PS: the format is not stable, it will be basing on the final requirement and bottle types |
Shrinking speed | 8-15 bags/min |
Shrinking manner | Electric heating |
Film size | Will be calculated basing on the final bottle format |
Film material | PE, PVC, POF |
Suitable bottle | Glass bottle, plastic bottle, aluminum can etc. |
Description
The package machine is developed especially for mineral water, beverage, wine, beer, product and soon Infusion medicine bottle combination packaging, with stable function, and the packed articles tight and orderliness. It can be used as a single pushing machine when high speed demanded.
Technical parameter
GENERAL TECHNICAL PARAMETERS | |
Machine size (L*W*H) | 5050*3300*2100mm |
Machine weight | 1200kg |
Wrappage max size (L*W*H) | 600*400*350mm |
Shrinkage film size | PE / PVC / POF |
Shrinkage thermo thickness | 0.03-0.15mm |
Thermo shrinkage tunnel temperature | 160 - 260° (can be adjusted) |
Max. output per minute | 10-15 bags / min basing on 500ml format 4*6 |
Installation power | 27kw |
Actual power | 15-18kw |
Driving manner | Soft driving |
Electric parts
Description | Brand (Origin) | Qty. |
AIRTAC pneumatic component | Taiwan | 1set |
Light sensor | Autonics | 4pcs |
Proximity switch | Autonics | 2pcs |
Thermo sealing knife | Domestic | 2pcs |
After sales service
Shipping | Port of loading: Shanghai port Port of discharge: Pending Container: LCL |
Installation and commissioning | Technician: 1 technician Duration: 5-7 days Daily salary: Negotiated/ day / technician |
Training | The Buyer should arrange workers who work on the production line to work with the Seller’s technician |
Preparation | Sample bottle, cap, water and electricity shall be ready before technician arrives |
Extra expense | Client should be responsible for the round-way flight tickets, local transportation, local hotel and eating; |
FAQ
Q: How Can I Visit Your Factory?
A: Our factory location:Zhenbei Road, Leyu Town, Zhangjiagang City, Jiangsu Province, China.
Contact: MOB / Wechat / WhatsApp: 0086 13584426100 (Vickie Sun)
Nearest train station: Wuxi Station / Wuxi East Station
Nearest international airport: Shanghai Pudong International airport (PVG) / Shanghai Hongqiao International airport (SHA) / Wuxi Shuofang airport (if you are already in China)
Q: How to can appropriate offer?
A: Please inform us below conditions to get the appropriate offer quickly:
1, What kind of product you will produce? Water, juice, carbonated drink, beer, ketchup or another?
2, What is your production capacity per hour / per day / per month?
3, What is your bottle types and cap types? Glass bottle, PET bottle, Aluminum can or another? And How many bottle types that you have?
4, What is the final labeling and packing manner?
For better communition quickly, please find us online contact below:
MOB / Wechat / WhatsApp: 0086 13584426100 (Vickie Sun)
Email: sunpiu2012@gmail.com (Vickie Sun)
More photos